Responsive Menu
Add more content here...

Enhancing GIS Data Quality to Support Grid Modernization for a Large North American Utility

Back to Case Studies

Electric utilities are initiating grid modernization programs to meet regulatory and customer reliability needs as well as address aging infrastructure.  These programs rely on the GIS representation of the electric network as the “system of record”; however, a comprehensive GIS data correction process is necessary to ensure the GIS data is complete, correct, and current to support the advanced network model.

Find out the data quality analytics solution that provided a roadmap for a successful grid modernization program by downloading the case study below.

Download Case Study

Recommended Reads

Construction Documentation for a Leading Architectural Practice

Construction Documentation for a Leading Architectural Practice

The client is a world-leading architectural studio, appointed as the Chief Architect for developing the master plan and designing the infrastructure for one of the largest estates in Africa.  RAMTeCH was appointed to complete a full set of construction Building Information Modeling (BIM) models along with construction drawings.  The key element of the project was …

Read More

Scan to Model for Critical Energy Assets

Scan to Model for Critical Energy Assets

Using state-of-the-art modeling techniques, RAMTeCH provided our client with a full set of 3D models.  The aim of the project was to develop a 3D Building Information Modeling (BIM) model from scanned data with mechanical and structural disciplines integrated into a single model. To learn more about the solution RAMTeCH executed and the benefits our …

Read More

MEP Engineering for a Mega Mixed-Use Development in UAE

MEP Engineering for a Mega Mixed-Use Development in UAE

The project was a marquee and prestigious greenfield construction of a 41-story mixed-use building.  The asset consisted of a podium space, and commercial and active areas interconnected with the residential tower.  Vegetation on the podium landscape created shaded areas to encourage all-day use of the space.  RAMTeCH was chosen by the lead MEP contractor to …

Read More

Get In Touch With Us