RAMTeCH implemented the Esri platform and mobile application with the UN UPDM and migrated the legacy GIS data to Hope’s new Esri GIS.
Discover the trusted and structured tools and processes that were key in transitioning Hope to the Esri platform and UPDM UN data model within an accelerated schedule.
The client is a world-leading architectural studio, appointed as the Chief Architect for developing the master plan and designing the infrastructure for one of the largest estates in Africa. RAMTeCH was appointed to complete a full set of construction Building Information Modeling (BIM) models along with construction drawings. The key element of the project was …
Continue reading “Construction Documentation for a Leading Architectural Practice”
Read MoreUsing state-of-the-art modeling techniques, RAMTeCH provided our client with a full set of 3D models. The aim of the project was to develop a 3D Building Information Modeling (BIM) model from scanned data with mechanical and structural disciplines integrated into a single model. To learn more about the solution RAMTeCH executed and the benefits our …
Continue reading “Scan to Model for Critical Energy Assets”
Read MoreThe project was a marquee and prestigious greenfield construction of a 41-story mixed-use building. The asset consisted of a podium space, and commercial and active areas interconnected with the residential tower. Vegetation on the podium landscape created shaded areas to encourage all-day use of the space. RAMTeCH was chosen by the lead MEP contractor to …
Continue reading “MEP Engineering for a Mega Mixed-Use Development in UAE”
Read More