Responsive Menu
Add more content here...

Streamlining Geospatial Data Projects for a Major Eastern North American Utility

Back to Case Studies

A major eastern North American utility, serving 10 million customers, had two legacy GIS platforms that aged beyond their ability to support their business.  Both systems were beyond their lifespans and were limiting expansion to support necessary operational evolution.  The utility made a strategic decision to move to the 10.6.1 release of the Esri platform to support growing business needs and new functionality.

To discover the project solution as well as the results and client benefits, download the case study below.

Download Case Study

Recommended Reads

Construction Documentation for a Leading Architectural Practice

Construction Documentation for a Leading Architectural Practice

The client is a world-leading architectural studio, appointed as the Chief Architect for developing the master plan and designing the infrastructure for one of the largest estates in Africa.  RAMTeCH was appointed to complete a full set of construction Building Information Modeling (BIM) models along with construction drawings.  The key element of the project was …

Read More

Scan to Model for Critical Energy Assets

Scan to Model for Critical Energy Assets

Using state-of-the-art modeling techniques, RAMTeCH provided our client with a full set of 3D models.  The aim of the project was to develop a 3D Building Information Modeling (BIM) model from scanned data with mechanical and structural disciplines integrated into a single model. To learn more about the solution RAMTeCH executed and the benefits our …

Read More

MEP Engineering for a Mega Mixed-Use Development in UAE

MEP Engineering for a Mega Mixed-Use Development in UAE

The project was a marquee and prestigious greenfield construction of a 41-story mixed-use building.  The asset consisted of a podium space, and commercial and active areas interconnected with the residential tower.  Vegetation on the podium landscape created shaded areas to encourage all-day use of the space.  RAMTeCH was chosen by the lead MEP contractor to …

Read More

Get In Touch With Us